April 14, 2016 7PM Ron Brown Modernization District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov Agenda Project Overview Ward 7/Deanwood Business and Workforce Participation Updates Exterior Site Improvements Review of Construction Schedule Afterhours Work District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov Project Overview Program Overview: 600 student city-wide college prep high school for males Location: 4800 Meade St NE, Washington, DC (Ron Brown Building)
Ward: 7 DGS Project Manager: Mia Sensabaugh DCPS Facilities Team: Patrick Davis & Toussaint Webster Architect: Perkins Eastman DC General Contractor: Gilbane Building Co. Project Completion Date: Phase 1 -- August 8, 2016; Phase 2 -- August 2017 Project Status: Design Development (Documents) District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov Local Workforce Outreach & Engagement Contractors Onsite Goel Services (Demo & Abatement) Onsite Workforce (to-date) DC Residents 54 employees Ward 7 Residents 15 employees Deanwood Residents 7 employees
Deanwood Workforce Interviews April 5th, 7th, and 14th 2016 (40 interviews) Contractors Bidding the Job Gilbane has identified 7 positions for Deanwood residents that can be moved onto the project in the next 30 days as part of a subcontract Bidding Contractors are screening available Ward 7 and Deanwood residents Deanwood Resident Workforce plan will be issued by the Trades upon award . District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov Local Business Outreach & Engagement Deanwood Business Interviews April 11th and 12th Two additional sessions planned April 18th and April 19th 21 businesses have been contacted 11 businesses have been interviewed Contractors Bidding the Job Bidding Contractors are screening available Ward 7 and Deanwood businesses Consideration is being given at all levels prime contracts, subcontracts and suppliers on
the project. District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov Local Services Needed Project Site Referrals from Deanwood Community: Catering/Restaurants Jobsite Events Pest Control Services Bottled Water Service More services are being identified Send all Inquiries: Ron Brown High School Project (Linda Graves) [email protected] (202) 230-7278 District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov CAMPUS PLAN
District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov SITE IMPROVEMENTS PEDESTRIAN CONNECTOR MAINTAINED NEW COURTS STUDENT GREEN ENTRY PLAZA District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov PARKING AND LOADING STAFF PARKING STAFF: +/- 100 SPACES: 83 EXISTING 85 PROPOSED
MODAL SPLIT 60% METRO/BUS 35% VIA CAR 5% BIKE/WALK DELIVERIES KITCHEN LOADING District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov Phase I Construction Schedule - March 2016 interior demolition and abatement begins in late March - April 2016 interior demolition and abatement continues through late April; exterior demolition begins in mid-April - May 2016 exterior demolition continues through end of May - June 2016 construction - July 2016 construction
- August 2016 Phase 1/first floor construction complete District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov Afterhours Work - Proposed Extended Work Hours: - Monday-Friday 6am to 9pm - Saturday 6am to 9pm - Sunday 7am to 3pm - The community can contact [email protected] or 202794-3549 with questions District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov Construction Hours Breakdown (Mondays Fridays) Interior Light Demolition Ceiling removal Loose equipment removal Loose furniture and fixture 5am-7am removal
(Mon-Fri) QUIET WORK Drywall removal Interior Light Construction Framing Drywall Masonry Pipe installation Duct installation Interior Finishes Ceiling Installation Flooring installation Interior Interim Clean-Up
Painting Finish Carpentry & Millwork installation Fixture/Device Installation Wire Installation QUIET WORK - QUIET WORK - QUIET WORK - QUIET WORK - QUIET WORK - QUIET WORK - QUIET WORK Interior Demolition Chipping Drilling 7am-7pm Grinding (Mon-Fri) Cutting Interior Construction Chipping Drilling Grinding Cutting
District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov Construction Hours Breakdown (Mondays Fridays) Interior Light Demolition Ceiling removal Loose equipment removal Loose furniture and fixture 7pm-10pm removal (Mon-Fri) Drywall removal Interior Light Construction Framing Drywall Masonry Interior Finishes
Ceiling Installation Flooring installation Interior Interim Clean-Up Painting Finish Carpentry & Millwork Installation Fixture/Device Installation Pipe installation Duct installation Wire Installation QUIET WORK - QUIET WORK - QUIET WORK - QUIET WORK - QUIET WORK - QUIET WORK - QUIET WORK District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov Construction Hours Breakdown (Saturdays)
Interior Light Demolition Ceiling removal Loose equipment removal 6am-7am Loose furniture and fixture removal (Sat ONLY) QUIET WORK Drywall removal Interior Light Construction Framing Drywall Masonry Interior Finishes Ceiling Installation Flooring installation Painting Finish Carpentry & Millwork installation
Fixture/Device Installation Interior Interim CleanUp Pipe installation Duct installation Wire Installation QUIET WORK - QUIET WORK - QUIET WORK - QUIET WORK - QUIET WORK - QUIET WORK - QUIET WORK Interior Demolition Chipping Drilling 7am-7pm Grinding (Sat ONLY) Cutting Interior Construction Chipping Drilling Grinding
Cutting District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov Construction Hours Breakdown (Sundays) Interior Light Interior Light Demolition Construction Ceiling removal Framing Loose equipment removal Drywall Loose furniture and fixture removal Masonry 8am-4pm (Sun ONLY) QUIET WORK Drywall removal Interior Finishes
Ceiling Installation Flooring installation Painting Finish Carpentry & Millwork installation Fixture/Device Installation Interior Interim Clean-Up Pipe installation Duct installation Wire Installation QUIET WORK - QUIET WORK - QUIET WORK - QUIET WORK - QUIET WORK - QUIET WORK - QUIET WORK District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov We Appreciate Your Support
DCPS Contact: [email protected] District of Columbia Public Schools | 1200 First Street, NE | Washington, DC 20002 | T 202.442.5885 | F 202.442.5026 | dcps.dc.gov