Project Proposal for Hydrology Project - Phase Ii

Project Proposal for Hydrology Project - Phase Ii

National Hydrology Project (NHP) NATIONAL INSTITUTE OF HYDROLOGY ROORKEE ROLE OF NIH IN NHP NIH is assigned with the following tasks in NHP: Planning and organising training programmes for capacity building of the Implementing Agencies (IAs).

Purpose Driven Support (PDS): Initiation, Review and Monitoring. Centre of Modelling Excellence in Hydrological Project Management Unit (PMU) at

NIH Dr. Sharad K Jain, Director Project Coordinator Dr. Sanjay K Jain, Sc. G Nodal Officer Er. C P Kumar, Sc. G PDS Coordinator Dr. A K Lohani, Sc. G Training Coordinator R&D Section Dr. Anupma Sharma, Sc. D, Dr. M K Sharma, Sc. D, Dr. R Thayyen, Sc. D, Mr. P K Agarwal Sc. B, Mr. Naresh Kumar, Sc. B Training Section: Dr. Sumant Kumar, Sc. C, Dr. L N Thakural Sc. C, Dr. Ashwini Ranade Sc. C, Mr. Prabhash Mishra Sc. B, and Dr. Gopal Krishna, Mr. Manoj K Goel Center for Excellence in Hydrological Modelling Dr N C Ghosh, Sc. G, Dr Anupma Sharma, Sc. D M&E Section Mrs. Deepa Chalisgaonkar Sc. F, Mrs. Suman Gurjar Sc. C Procurement Section

Dr. Surjeet Singh Sc. D, Mr. Manish Nema, Sc. C Finance Section Mr. S S Lamba, Finance Officer, Mr. Rajneesh Goel, Section Officer FUNDS RECEIVED AND EXPENDITURE Fund received 2016-17 : Rs. 2,88,80,000 Expenditure : Rs. 1,00,82,399 Fund received 2017-18 : Rs. 3,14,00,000 Expenditure : Rs. 10,46,411 MAJOR PROCUREMENT 2016-17 and 2017-18 The procumbent of equipments were proposed under annual work plan and approved under component A for the year 2016-17 and 2017-18. For the year 2016-17 the

equipments were proposed for three labs. (no list was provided), while for the year 20172018, the list and cost of the approved equipments for three labs of NIH are given in the table below. Total budget for the year 2016-17 and 2017-18 is Rs. 4.2 crore. The revised budget for the two years is same i.e. Rs. 4.2 Crore. Total Revised Equipments to be Total Budget Approved (Crore) Equipments Approved (2017- Budget (Crore) 18) HYDROLOGICAL INVESTIGATION (HI) LAB Dual Carbon C13 Isotope analyser 1.0 Element Analyser (CNS) Tritium Enrichment Unit

Normal Scintillation Counter Liquid Nitrogen Plant 0.50 0.50 0.20 0.20 MAJOR PROCUREMENT 2016-17 and 2017-18 Equipments Approved Total Revised Budget Equipments to be (Crore) Approved Total

Budget (Crore) SOIL WATER LAB. Ion Chromatograph with auto sampler and necessary accessories, CHNS analyzer with biomass converter, Millipore water system (ultrapure), Air Pycnometer, Microwave digester, Tension Infiltrometer : 6 nos 1.00 Same, no change 1.0 WQ LAB. Gas Chromatograph Mass

Spectrophotometer GCMS 0.70 GC-MS Dedicated Auto Titrator TOC Analyzer 1.00 0.40 0.40 For HI, WQ and Soil Water Lab. for the year 2016-17 1.50 NIH Nodal Agency for training needs Training needs analysis Formation of expert committee for

Preparation of training calendar Identification of training institutes Course contents and modules Oragnisation of training courses as per training calendar Training/Workshops organised Total 39 training and workshops have been oragnised under NHP since 2015. Out of which some of the courses have been organised by NIH. NIH has oragnised training courses on i. Basics of Hydrology,

Ground water hydrology, HEC based modelling solutions, Hydrologic forecasting etc. Beside this, some of the courses have been organised jointly with CWC and CWPRS. Some times, it is difficult to get participants for the training course. sufficient number of PURPOSE DRIVEN STUDIES (PDS) One of the main focus of NHP is to take up R&D studies in the form of Purpose driven studies (PDS). PDS would address the specific issues of water management problems identified within the area of operation of implementing agencies and of public concern. Outcome of the studies are expected to provide feasible and cost effective methodologies for replication in other areas

situated in similar hydrological and hydro-geological setup. To Total PDS received 30 Presented during first R&D Session (13-14 July, 2017) 26 Sent for approval/revision : 20 PFMS: Public Financial Management System National Institute of Hydrology, is already registered on Roorkee PFMS. The Bank Account No. 35527112389 (NHP) is linked to the PFMS. Soon NIH PFMS account will be

operational. WAY FORWARD Oragnisation of trainings as per the training calendar and as per the need/requirements of the IAs R&D session of the PDS received from IAs Preparation of bid documents of all the equipments Studies to be carried out in the Centre of Excellence of modeling THANKS

Recently Viewed Presentations

  • EPA E-Enterprise: Pesticides Data Accessibility & Label ...

    EPA E-Enterprise: Pesticides Data Accessibility & Label ...

    EELC Liaison: Louise Wise, Office of Chemical Safety and Pollution Prevention Eventually the app will be able to screen all approve languages from master label.
  • Animal Development Chapter 53 Fertilization In all sexually-reproducing

    Animal Development Chapter 53 Fertilization In all sexually-reproducing

    Concentration of morphogen Animal pole Pigmented cortical cytoplasm Gray crescent Organizer Dorsal mesoderm- inducing signal Mesoderm- inducing signals (TGF-b family proteins) Nieuwkoop center Point of sperm entry Clear cortical cytoplasm Inner cytoplasm Diffuse black pigment Microtubule array Microtubules Dorsal determinants...
  • 無投影片標題 - Po Leung Kuk Lo Kit Sing

    無投影片標題 - Po Leung Kuk Lo Kit Sing

    Where is the treasure? N E S W Whole Circle Bearing (方位角) More accurately, we can use whole circle bearing. The compass is divided into 360o counting clockwise from the north. 360 º Here is one more example. N E...
  • Digging In: Policy Innovation for a Healthy Food System

    Digging In: Policy Innovation for a Healthy Food System

    Digging In: Policy Innovation for a Healthy Food System Sacramento's experience turning food action into policy change. My name is Matt Read and I am a lawyer working in Sacramento. Thanks to Juell, Chanowk, Christine, and the BHC leaders that...
  • Group Success & Leadership

    Group Success & Leadership

    Carron's Antecedents. Environmental factors - The group were training together regularly and all lived within close proximity. Different ages within the team meant that there was experienced players for the younger players to look up to. ... This is a...
  • ONTOLOGY OF EVENT EVALUATION - Goodfellow Publishers

    ONTOLOGY OF EVENT EVALUATION - Goodfellow Publishers

    EVENT EVALUATION: PowerpointFigures from the book (Getz, 2018) Figure 3.1 CIPP Applied to a Charity Event . Figure 3.2 Evaluation Complexity Model
  • Center for Biofilm Engineering Importance of Statistical Design

    Center for Biofilm Engineering Importance of Statistical Design

    Diane Walker. Lindsey Lorenz. Paul Sturman. Kelli Buckingham-Meyer. What is statistical thinking? Data. Design. Uncertainty assessment. Once you have chosen a reactor system relevant to your question of interest, it is time for some statistical thinking.
  • Chapter 2: Fundamentals of the Analysis of Algorithm Efficiency

    Chapter 2: Fundamentals of the Analysis of Algorithm Efficiency

    Chapter 2 Fundamentals of the Analysis of Algorithm Efficiency ... Empirical Analysis of Algorithms General Plan for Empirical Analysis of Algorithms Time Efficiency Understand the experiment's purpose Decide on the efficiency metric M to be measured and the measurement unit...