Tower Safety Austin, TX August 11, 2016 Sim A. Kolliner CPBE There is always risk in building and maintaining the "Big Iron" towers we use in broadcasting. However, there are things we can do to protect lives and property.

Some Statistics What is wrong with this Picture? He is Riding the Load What is Riding The Load? Tying off to the load rather than the load line The Load Goes, So Go You Dont Ride The Load

Tie-off With A Separate Clamp To The Load Line Climb Alongside the Load On The Ladder Ride In A Separate Personnel Lift (If Used) Philadelphia 11-10-1998 What Could Have Been Done in Philadelphia to Produce a Different Outcome? Tie off to a cable clamp above the load clamp? Climb ladder instead? Training?

Safety meeting? 100% tie off commitment? OSHA & FCC Sharing Best Practices Recognizing the risks that tower workers face, OSHA and the FCC organized a workshop on communication tower worker safety on October 14, 2014. During this workshop, industry stakeholders, along with worker safety advocates and the families of communication tower workers who had been killed on the job, gathered to discuss the issues surrounding tower safety. This

presentation contains portions of the OSHA/FCC Best Practices document. OSHA & FCC Sharing Best Practices Safety and health management systems All entities should establish a comprehensive safety and health management system. Core Elements o o o o

o o o Management leadership Worker participation Hazard identification and assessment Hazard prevention and control Education and Training System evaluation and improvement Communication on multiemployer workplaces

OSHA & FCC Sharing Best Practices Tower Climbers and Ground Crew Workers All work crews must be provided with and must use proper safety equipment at all times. All workers should annually certify their commitment to 100 percent tie off. All climbing work should include comprehensive safety planning. All work crews should not work at heights when weather conditions raise safety risks. All work crews should continually seek to enhance their safety skills and awareness through regular trainings and stand-downs. Particular attention should be paid to inspections, including equipment inspections. Contractors must ensure that there is a competent person on site at all times. This person should monitor the mental and physical wellbeing of climbers on their team.

OSHA & FCC Sharing Best Practices Tower Owners Tower inspection and maintenance: Tower owners should ensure that their towers are maintained properly, structural inspections, including TIA-222-G, are conducted on a regular basis and have a properly installed, maintained and functioning safety climb system. Ensure that there is a clear procedure for reporting unsafe conditions on towers and that all reported conditions are tracked until the hazardous conditions have been fixed. Inspections: Hire a company using drones for tower inspection to reduce unnecessary climbing and avoid putting workers at risk. Tower owners are strongly encouraged to require contractors to send photos of

completed work to their central command centers. The command centers can then immediately approve the work before the worker even descends the tower. This can reduce unnecessary climbing for re-work. OSHA & FCC Sharing Best Practices Tower Construction and Maintenance Contractors Safety and health management systems: Contractors should have a written, comprehensive health and safety management system that is implemented on all worksites. Elements of this system should include, at least, training, inspections, audits, personal protective equipment, and individual work practices. Contractors should ensure that all employees are aware of existing consensus standards

governing communication tower work and are familiar with the requirements that apply to their work activities. Encourage all employees to report unsafe conditions at work sites to company management, as well as to relevant parties up the contracting chain. When starting work for the day, foremen should conduct a toolbox meeting where the Job Hazard Analysis (JHA) is discussed. OSHA & FCC Sharing Best Practices Tower Construction and Maintenance Contractors Auditing and incident investigations: Whenever an injury or fatality occurs on a work site, contractors must first notify all appropriate authorities, including local emergency services and OSHA.

Contractors should have internal policies for investigating incidents that take place on work sites in order to determine the root cause of the incident. If the incident is due to an individual bad actor, then the contractor should re-examine internal policies for employee training, re-training the individual and all employees if needed. OSHA & FCC Sharing Best Practices Tower Construction and Maintenance Contractors Work site safety practices: All contractors should require supervisors to conduct a tailgate meeting at the beginning of each work day. Contractors should institute work policies and procedures that guarantee that safe work

practices will always be followed on site. Zero-tolerance policy to unsafe work practices: It is quickly becoming a recognized best practice in the industry to institute a zero-tolerance policy regarding unsafe practices, in particular towards free climbing. Sub-contractor vetting: Where further subcontracting is permitted, contractors should take precautions to ensure that any potential sub-contractors have effective safety and health programs in place, and have a history of safe work practices on site. OSHA & FCC Sharing Best Practices Tower Construction and Maintenance Contractors

Recordkeeping and communication: Contractors should keep comprehensive records of all employee training and certifications. Contractors should obtain necessary technical and engineering specifications from tower owners. Training: Contractors should ensure that all employees who climb communication towers are trained for the tasks that they will be expected to perform. Contractors should ensure that employees new to tower climbing undergo comprehensive training as authorized climbers. Employees who will be expected to perform rigging or hoisting activities should have

specialized training to ensure that they can safely perform these tasks. Contractors should ensure that employees are re-trained at appropriate intervals, as well as on an as-needed basis. OSHA & FCC Sharing Best Practices Tower Construction and Maintenance Contractors Training: Contractors should ensure that employees are re-trained at appropriate intervals, as well as on an as-needed basis. When making use of train the trainer programs, ensure that the employee who will be performing training is adequately prepared to train all employees.

OSHA Directive CPL 02-01-056 OSHA Directive CPL 02-01-056 Appendix A Compliance Guidelines for Employee Access by Hoist During Communication Tower Work

Activities Table of Contents Definitions II Hoisting Personnel II Training II Equipment III Trial Lift and Proof Testing IV

Pre-Lift Meeting V Documentation V Hoisting Employees to or from the Workstation V Communication Between the Hoist Operator and Hoisted Employees VI Falling Object Hazards VII Weather Conditions VII

Energized Power Lines VII Hydraulic Hoists (Drum Hoists) VII Hoist Mounting IX Drums IX Brakes and Clutches IX Hoist Controls X

Wire Rope and Rigging XI Hoist Operator XI Hoist Inspections XI Elevator Safety Contractor Safety Plan Training Check and Look Make sure you are disconnected before you go DO NOT bypass any interlock or safety devices.

Your Part Make sure the elevator is working properly Checklist Training Certification Authority to Stop Work

Pre-Climb Meeting Assure no interlocks are bypassed FAA Tower Lighting Logging Requirements Light Malfunction Notification Strobes Planes Will Hit What They Cant See RF Safety

Contractor Safety Plan Training Safety Gear Measurement Devices Your Part Observation Checklist

Training Certification Safety Gear Authority to Stop Work Pre-Climb Meeting Things To Remember DO NOT Ride The Load Safety Equipment, check it and use it every time Training, Training, Training (Did I Mention Training) 100% Tie Off Commitment

Pre-climb meeting and Job Hazard Analysis (JHA) Anyone should be able to stop work if hazardous Assess and document tower work Have someone observe if possible Ensure RF Exposure Safety In Summary Common Sense and Awareness MUST Come First! Have a Plan That Documents, Informs and Protects Meet Before Work Starts to Review The Plan Make Sure Climbers are Trained and Current Make Sure Anyone Can Stop an Unsafe Operation

Check the Contractors Safety Record and Reputation Dont Let The Schedule Determine Safety Ask for Verification of Training and Vet the Subcontractors too AND FINALLY. Remember - OSHA is NOT a City in Wisconsin ! Questions?

Recently Viewed Presentations

  • 13- 1 Chapter Thirteen McGraw-Hill/  2005 The McGraw-Hill

    13- 1 Chapter Thirteen McGraw-Hill/ 2005 The McGraw-Hill

    Dan Ireland, the student body president at Toledo State University, is concerned about the cost to students of textbooks. He believes there is a relationship between the number of pages in the text and the selling price of the book....
  • Profile edge28 | total equity performance

    Profile edge28 | total equity performance

    Author: Melanie Vollenhoven Created Date: 03/09/2016 23:03:47 Title: Profile edge28 | total equity performance Last modified by: Siebert Andrew Company
  • Negligence - unizg.hr

    Negligence - unizg.hr

    e. Richard's failure to report the fact that he had lost the case file was _____ a serious _____ on his part and he was subsequently dismissed from employment. f. Do you think that suing a supermarket chain for negligence...
  • Update on the Multilateral Effectiveness Initiative James Melanson

    Update on the Multilateral Effectiveness Initiative James Melanson

    CIDA prepared reports based on the pilot tests of the ADB and WHO reviews . Successful use of the methodology . Reviews provided good understanding of the organizations' development effectiveness, however, given the low number of evaluations available from WHO,...
  • Feeding Relationships - MR JEFF'S SECONDARY SCIENCE 1

    Feeding Relationships - MR JEFF'S SECONDARY SCIENCE 1

    What would the food web for these food chains look like? plants owl aphid blue tit ladybird plants moth owl blue tit plants vole stoat plants vole owl bluetit owl chiffchaff stoat vole plant aphid ladybird moth spider 1. Name...
  • Mid term review Neolithic Revolution  Paleo, Humans, Neolithic

    Mid term review Neolithic Revolution Paleo, Humans, Neolithic

    Medieval Europe. Silk road- Trade route from China to the West. Feudal System(Like the Caste System in India)- Social class system that developed after the turmoil of repeated invasions into the Roman Empire
  • Session One: Library Resources and Skills

    Session One: Library Resources and Skills

    LCSH = Library of Congress Subject Headings Subject headings vs. keywords For example, we might be thinking of a topic and calling it "GUN CONTROL," but the LCSH calls the same topic "FIREARMS--LAW AND LEGISLATION." When we are searching for...
  • Approximations and Round-Off Errors Chapter 3

    Approximations and Round-Off Errors Chapter 3

    Chapter 3 Approximations and Round-Off Errors Chapter 3 For many engineering problems, we cannot obtain analytical solutions. Numerical methods yield approximate results, results that are close to the exact analytical solution.